# Job Scheduling

> Turn interval-level plans into floor-level execution: jobs on resources, sequenced with changeovers.

<span className="prodex-title-badge"><Badge icon="star" color="orange" size="lg" shape="rounded">Beta</Badge></span>

<Info>
  **Coming Soon.** Job-level scheduling — assigning jobs to specific resources with detailed timelines, changeover-aware sequencing, and downtime-aware feasibility — is on the roadmap and is not available in the product today. This page describes what the capability will cover and what to use in the meantime.
</Info>

## Overview

[Production Planning](/product/planning-overview) answers *what* to produce and *when*, at the granularity of the planning horizon's interval — typically a day, a week, or a month. Job scheduling will answer *who does what, on which resource, in what order*, at the granularity of individual jobs with start and end times: a floor-level plan you could hand to a shift lead.

The two are complementary, not substitutes. Planning commits to production quantities per interval; scheduling turns those quantities into a sequenced timeline on specific resources.

<Note>
  Two things in the product already carry the word "schedule," and neither is job scheduling: **[simulation schedules](/reference/schedules)** are timed inputs to a simulation model (when entities are released, when scheduled actions fire), and **[scheduled jobs](/product/dexter/scheduled-jobs)** are recurring Dexter tasks that run on a timer.
</Note>

## What Today's Product Covers

Two capabilities cover parts of the problem job scheduling will eventually solve end-to-end:

* **[Production Planning](/product/planning-overview)** decides interval-level production quantities against demand, on-hand inventory, resource capacity, and inventory goals. It respects hard capacity limits and honors deadlines through [order tags](/product/planning-models#order-tags), which can be soft (a weighted lateness penalty) or hard (an enforced constraint). If your question is *"given this demand book and this capacity, what should we produce next week?"* — planning is the answer.
* **[Simulation](/product/simulation-overview)** models the floor as-is — resources, process flow, shift patterns, downtime, variability — and plays out a given production plan or arrival stream to see what actually happens. If your question is *"will the floor actually hit these numbers given shifts, changeovers, and typical variability?"* — simulation is the answer.

Together they cover the two ends: planning gives you the quantities to commit to, and simulation pressure-tests whether the floor can execute them. Simulation is descriptive rather than prescriptive, though — it does not choose the job sequence, it plays out one you give it.

## The Gap Job Scheduling Will Close

Between *"produce 4,200 units of SKU-A next week"* and *"run job #47 on Line A starting Tuesday 09:12"* sits the sequencing problem. That is what job scheduling will address when it ships:

* **Assigning jobs to specific resources** — not "the packaging pool has 80 hours this week," but "this job runs on Packer 2"
* **Changeover-aware sequencing** — a changeover matrix (the setup-time cost of switching from one job type to another on a given resource) drives an order that keeps setup time low
* **Per-resource downtime and availability calendars** — maintenance windows, shift patterns, and holidays that block job placement on a specific machine
* **Job-level precedence from the BOM graph** — a component's job must finish before its parent's job starts, read from the same [BOM structure](/product/bom-overview) planning uses
* **A job-level timeline as output** — a Gantt chart of start and end times per job per resource, changeover gaps visible, unfulfilled jobs flagged when capacity is insufficient
* **Sequencing KPIs** — makespan, resource utilization, changeover time as a share of run time
* **Manual edits on top of an optimized schedule**, with both versions retained
* **Scenario comparison** across scheduling runs with different downtime calendars, capacities, or targets

None of these exist in the product today. This page will be expanded as the capability lands.

## What to Do in the Meantime

If you need floor-level sequencing today, the practical path is:

1. Use [Production Planning](/product/planning-runs) to fix the interval-level production quantities against demand, capacity, and inventory goals.
2. Use [Simulation](/product/simulation-overview) to model the floor and validate that the planned quantities survive realistic timing, downtime, and variability — [simulation schedules](/reference/schedules) let you specify when entities arrive and when actions fire.
3. For the sequencing decisions themselves — job order on a specific machine, changeover-minimizing assignments — keep your existing scheduling process (scheduling board, MES, or spreadsheet) and [ask Dexter](/product/dexter/chat-and-tasks) to help reason about trade-offs, encode rules, and cross-check against planning output and simulation results.

<Tip>
  A common working pattern: let planning commit weekly quantities, hand Dexter the week's committed quantities plus your machine list and changeover rules, and have him draft a candidate sequence you refine by hand — then simulate the result to check it holds up.
</Tip>